Projects

Built, wired and switched on.

  • 33.5 MW of solar
  • 7 farms commissioned
  • 1 on site now

Anuradhapura Commissioned

Anuradhapura Solar Power Plant

  • 5 MW
  • 5 months
  • DIMO Energy

The complete electrical infrastructure for DIMO Energy's 5 MW plant: panel installation, structures, wiring, testing and commissioning, handed over ahead of schedule. It now generates 9.48 million kWh a year, enough for more than 6,000 homes.

  • Galvanized structures
  • Panel installation
  • DC & AC wiring
  • Switchyard
  • Testing & commissioning

Trincomalee Commissioned

Trincomalee 15 MW Solar Farm

  • 15 MW

Our largest field yet: 15 MW of tables laid out in a disciplined grid across the dry zone, with central inverter stations and access roads between the blocks.

  • Structure erection
  • Panel fixing
  • Cabling
  • Commissioning support

Trincomalee Commissioned

Trincomalee 4.5 MW Solar Farm

  • 4.5 MW

High-mounted bifacial tables on galvanized posts, string inverters on every row and neat DC runs in cable trays, built for the coastal dry zone.

  • Galvanized structures
  • Panel fixing
  • DC wiring & trays
  • Inverter mounting
  • AC termination

Rathgama Commissioned

Rathgama Solar Farm

  • 3 MW
  • 2 months
  • DIMO

A 3 MW farm on rolling, uneven land, delivered in two months. Every table follows the contour of the hill, from galvanized structures to switchyard and commissioning.

  • Erection of galvanized structures
  • Fixing of solar panels
  • DC cable wiring
  • LV cable laying & termination
  • Transformer placement
  • Construction of switchyard
  • Commissioning

Weerakatiya Commissioned

Weerakatiya Solar Farm

  • 2 MW
  • 3 months
  • DIMO

A 2 MW farm in the south, built in three months: structures, panels, wiring, AC termination, transformer, switchyard and commissioning.

  • Erection of galvanized structures
  • Fixing of solar panels
  • DC cable wiring
  • LV cable laying & termination
  • Transformer placement
  • Construction of switchyard
  • Commissioning

Kuliyapitiya Commissioned

Kuliyapitiya Solar Farm

  • 2 MW

Civil works for a 2 MW farm among the coconut estates: auger-bored footings, reinforced pole bases, compacted posts and the steel frames that carry the panels.

  • Auger boring
  • Rebar & concrete footings
  • Pole erection
  • Structure assembly

Thalawa Commissioned

Thalawa Solar Farm

  • 2 MW

From bare dry-zone land to a field of tables: setting out, auger boring, cast-in-place foundations with anchor bolts, and steel frames ready for panels.

  • Setting out
  • Auger boring
  • Foundations & anchor bolts
  • Structure erection

Ongoing project Ongoing

Hill-country Solar Farm

    Under construction now: a terraced farm that climbs a steep, wooded hill, with trenching, conduits and combiner boxes going in block by block.

    • Terraced structures
    • Trenching & conduits
    • Combiner boxes
    • Cable laying

    Western & Sabaragamuwa Network

    MV & LV Power Lines

      Overhead line construction and maintenance: pole erection with our auger and crane trucks, crossarms and insulators, pole-mounted transformers, stringing, and underground cable trenches.

      • Pole erection
      • Crossarms & insulators
      • Pole transformers
      • Stringing
      • Underground cable