071 553 6944

Energy-sector construction · Horana, Sri Lanka

We build thepowerSri Lanka runs on.

Utility-scale solar farms, overhead and underground power lines, switchyards and commissioning, plus the trucks and crews to do it.

  • 33.5MW of solar built
  • 7Solar farms delivered
  • 9.48MkWh a year from Anuradhapura alone
  • 6,000+Homes powered by that one plant
Solar farmsOverhead linesUnderground cableSwitchyardsCommissioningMachinery hire

Who we are

Green Voltage is an energy-sector construction company from Horana. We turn bare land into grid-connected solar farms, raise the poles and string the lines that carry the power, and dig the trenches that keep it underground. One crew, one standard, from the first auger bore to the day the switchyard goes live.

The Green Voltage crew outside their site container
Engineers in hi-vis walking a finished solar farm

What we do

Four crafts, one crew.

  • Civil and electrical works for grid-scale solar: from setting out bare land to energising the switchyard. Flat dry-zone fields or terraced hillsides.

    • Foundations & piling
    • Galvanized structures
    • Panel installation
    • DC / AC wiring
    • Switchyards
    • Commissioning
  • Construction of all kinds of overhead lines: pole erection, crossarms and insulators, stringing, and pole-mounted transformers.

    • Pole erection
    • Crossarms & insulators
    • Conductor stringing
    • Pole transformers
  • Trench work for cable laying, with conduits, LV cable runs and terminations, dug clean and backfilled right.

    • Cable trenches
    • Conduits & ducting
    • LV cable laying
    • Terminations
  • The same trucks that build our projects, available to hire with trained operators and helpers: aerial bucket, auger crane and crane boom trucks.

    • Aerial bucket truck
    • Auger / crane truck, 3 t
    • Crane boom truck
    • Operators included

How we build a solar farm

Bare land to grid, in nine stages.

  1. Set out the land
    01

    Set out the land

    Survey, clear and peg out every row on bare ground.

  2. Bore & pile
    02

    Bore & pile

    Auger-bored holes up to 3 m deep for every footing.

  3. Foundations
    03

    Foundations

    Cast-in-place footings with anchor bolts set true.

  4. Galvanized structures
    04

    Galvanized structures

    Steel tables erected and aligned to the sun.

  5. Fix the panels
    05

    Fix the panels

    Thousands of modules clamped and torqued.

  6. DC wiring
    06

    DC wiring

    Strings dressed into trays and inverters.

  7. LV cable & termination
    07

    LV cable & termination

    Cable pulled from the drum, laid and terminated.

  8. Transformer & switchyard
    08

    Transformer & switchyard

    Transformer placed, switchyard built.

  9. Commissioning
    09

    Commissioning

    Tested, energised and handed over.

  10. Energised. Handed over, often ahead of schedule.

Projects on the island

33.5 MW and counting.

From the dry zone around Anuradhapura and Trincomalee to the hills of the south: every pin is a farm our crews built. Pick one.

Horana HQAnuradhapura · 5 MWTrincomalee · 15 MWTrincomalee · 4.5 MWRathgama · 3 MWWeerakatiya · 2 MWKuliyapitiya · 2 MWThalawa · 2 MW
Aerial view of the 5 MW Anuradhapura solar farmCommissioned

Anuradhapura Solar Power Plant

  • 5 MW
  • 5-month build
  • For DIMO Energy

The complete electrical infrastructure for DIMO Energy's 5 MW plant: panel installation, structures, wiring, testing and commissioning, handed over ahead of schedule. It now generates 9.48 million kWh a year, enough for more than 6,000 homes.

Project photos

From the field

Drag to explore →

  • Fitting a crossarmFitting a crossarm
  • Rathgama, from the droneRathgama, from the drone
  • Pulling LV cable off the drumPulling LV cable off the drum
  • Pole transformer, energisedPole transformer, energised
  • Inverter, wired and dressedInverter, wired and dressed
  • Setting a precast post, ThalawaSetting a precast post, Thalawa
  • Last light on the arrayLast light on the array
  • Rebar cage for a pole baseRebar cage for a pole base
  • Trincomalee rowsTrincomalee rows
  • Cable trench, site officeCable trench, site office
  • Terraces on the hill, ongoingTerraces on the hill, ongoing
  • Climbing to the lineClimbing to the line

Machinery hire

Our trucks, your site.

The same fleet that builds our projects, available to hire, always with a trained operator and helper.

Aerial bucket truck

ඒරියල් බකට් ට්‍රක්

Aerial bucket truck

Working height
12 m
Bucket load
200 kg
Crew
Operator + helper
  • Power line work
  • Street lights
  • Building maintenance & repairs
Anuradhapura 5 MWTrincomalee 15 MWTrincomalee 4.5 MWRathgama 3 MWWeerakatiya 2 MWKuliyapitiya 2 MWThalawa 2 MW

Leadership

Chethika Gamage

Managing Director, Green Voltage

Founder · 2021
Solar farms, MV lines & infrastructure construction. Utility-scale installation and commissioning.
Chethika Gamage on LinkedIn
The Green Voltage team at DIMO Energy's Anuradhapura power plant
The team at DIMO Energy’s 5 MW Anuradhapura plant, delivered ahead of schedule.
  1. 2017

    BEng, Software Engineering

    Staffordshire University (APIIT Sri Lanka)

  2. 2018

    Assistant Manager

    Senhora Synergies

  3. 2019

    Functional Consultant

    LOLC Technologies

  4. 2020

    Project Manager

    Gamage and Sons Construction

  5. 2021

    Founded Green Voltage

    Horana

  6. 2022

    Managing Director

    Green Voltage

Start a project

Got land, a line or a lift? Let’s talk.

What do you need?
Email instead